| Name of Project | Scope | Location |
|---|---|---|
| Qatar Islamic Insurance Branch | Fit-Out Works | Barwa Commercial Avenue |
| QDFR467-SN1036-Sports Store | Fit-Out Works | Hamad International Airport |
| Louis Vuitton Store | Fit-Out Works | Hamad International Airport |
| 2B-G-7F-ROOF Zone-(A,B,C) | District Cooling System | Yasmeen / Lusail City |
| Recreational Vehicle (Type TDB) for FIFA 2022 | Fit-Out Works | Al Wakrah Stadium |
| Supply, Installation ELV Works w-Interface in Parking Management | CCTV, WIFI & Telecom | P2 & P3 - Qatar University |
| Traditional Souq | MEP Works | Shop 4, 5 & 8 - Ain Khalid |
| Turnkey Housing Units for a Private Project for FIFA 2022 - 2500 Units | Fit-Out Works | Accommodation for Delegates |
| Barwa Commercial Avenue - Office & Showroom |
|
Lusail City |
| CP-1A & CP-2B Lusail |
|
Lusail City |
| Qatar National Library - Qatar Foundation | MEP Works | Qatar Foundation |
| Worker Hospital & Health Center | MEP Works | Mesaieed Doha, Qatar |
| HIA Duty Free | MEP Works | Hamad International Airport |
| HIA Hangar CP-11 | MEP Works | Hamad Int’l. Airport |
| Fujita Red Line Station - Drake & Scull | MEP Manpower Supply - Engineers & Supervisor | Al Wakrah Rail Station |
| Thermigas Red Line Station | MEP Manpower Supply - Engineers & Supervisor | Al Bidda Station |
| Brookfield / Drake & Scull | MEP Manpower Supply - Engineers & Supervisor | Musherib |
| Good Life Shop |
|
The Pearl |
| CP-1A & CP-2B Lusail |
|
Lusail City |
| Toys Box Shop |
|
Ezdan Mall, Al Wakrah |
| LS Cable Project | Fit-Out Works | Bin Mahmoud |
| Qtel 3rd Data Center Building | Civil Works | Wadisial, Doha |
| Qtel Headquarters | Civil Works | Wadisial, Doha |
| NDIA (New Doha International Airport) Bleistein Enterprises (ADCC) | Civil Works | NDIA |
| Four Season’s Hotel | MEP Works | West Bay Doha, Qatar |
| Name of Project | Scope | Location |
|---|---|---|
| D41 Foxhill Lusail Project | Prepared Shop Drawing Design | Lusail City |
| D51 Foxhill Lusail Project | Prepared Shop Drawing Design | Lusail City |
| D51 Foxhill Lusail Project | Installation for Termination MV Panel | Lusail City |
| A34 Foxhill Lusail Project | Prepared Shop Drawing & Design | Lusail City |
| Keepel Seghers CCTV Repair | CCTV Troubleshooting for Fiber Optic Converter | Um Salal Alih |
| Misela Building Project | MEP Works | Madinah South |
| Merwab Hotel Level 24 | MEP Works | Westbay Doha, Qatar |
| Merwab Hotel Level 24 | Fit-Out and Painting Works | Westbay Doha, Qatar |
| Cedric Hotel Level 32 | MEP Works | Westbay Doha, Qatar |
| Cedric Hotel Level 32 | Fit-Out and Painting Works | Westbay Doha, Qatar |
| Silar Hotel | Light Fitting Installation Works | Westbay Doha, Qatar |
| Silar Hotel | Fit-Out Works | Westbay Doha, Qatar |
| Project | Category | Scope | Location |
|---|---|---|---|
| Tower A, B, C | ELV System Works | Intercom System / Gate Barrier | Yasmeen City, Lusail |
| Arab International Academy School Tarsheed | Civil Works | Drywall / Painting / Welding | Wadi Al Banat Doha Qatar |
| Arab International Academy School Tarsheed | Fit-Out Works | Cabinet / Sliding Cabinet | Hamad International Airport |
| Program 8 Hotel East No.2 | Architecture Works | Prepare Shop Drawing | Red Sea Saudi Arabia |
| Sheik Palace Majlis | Civil Works | Painting / Marble Polishing | Al Rayyan Doha Qatar |
| GEWAN Island Building 4B & 6B (SECC) | Fit-Out Works | Kitchen Cabinet | The Pearl Qatar |
| GEWAN Island Building 4B & 6B (SECC) | Manpower Supply | Technician | The Pearl Qatar |
| GEWAN Island Building 4A, 4B, 5A, 5B, 7A, 7B (SECC) | MEP Works | Installation & Termination - Solenoid Valve, BTU-Meter, Water Meter | The Pearl Qatar |
| GEWAN Island Building 4A, 4B, 5A, 5B, 7A, 7B (SECC) | MEP Works | DDC Panel Installation & Termination | The Pearl Qatar |
| GEWAN Island Building 4A, 4B, 5A, 5B, 7A, 7B (SECC) | MEP Works | Cable Pulling, GI Conduit & Trunking, Spar Outlet and Power | The Pearl Qatar |
| GEWAN Island Building 4C, 4D (Unique Design) | MEP Works | Installation & Termination - Solenoid Valve, BTU-Meter, Water Meter | The Pearl Qatar |
| GEWAN Island Building 4C, 4D (Unique Design) | MEP Works | DDC Panel Installation & Termination | The Pearl Qatar |
| GEWAN Island Building 4C & 4D (Unique Design) | MEP Works | Cable Pulling, GI Conduit & Trunking, Spar Outlet and Power | The Pearl Qatar |
| GEWAN Island Building 4C & 4D (Unique Design) | Manpower Supply | Technician | The Pearl Qatar |
| GEWAN Island Building 4C & 4D (Unique Design) | MEP Works | FCU | The Pearl Qatar |
| GEWAN Island Building 4C & 4D (Unique Design) | MEP Works | Power & Lighting | The Pearl Qatar |
| GEWAN Island Building 4C & 4D (Unique Design) | MEP Works | Spar Outlet Installation & Termination | The Pearl Qatar |
| Doha Sewage Treatment | MEP Works | Plastic Recovery & Quality Improvement of S&R Plant | Messaed |